汽轮发电机组用户情况登记表


  汽轮发电机组用户情况登记表
      Our   Questions : 用户填表栏:
Buyer  legal address :  
 
 
Buyer  Phone / Fax  
 
 
Power plant exact location:
(Province /city /town /district / street / )
   
Power plant exact application :
( will be used for what purpose ? )
   
You wish the Power ( MW )  
 
 
 
 
 
Plant other condition :
 
1. Please give us the Plan arrangement drawing and photos.  
2. The “fuels” : the plant will use coal /Oil / wood / or the above 2 together?  
3. The detailed “water treatment” way  ? 水处理的要求?  
4. This plant “electricity “will be joint to the public national ( or local ) “electricity net ” or it will be running independently .  
5. If you require us to design all Power plant for your side ?
  (  Including the Plant plan
arrangement design ? )
 
 
 
 
 
 
The “equipment ”
matching condition :
1.      The boiler structure type :  if
you like to use “Circle
Sulfuration-Bed” (CFB) type ?
   If you should also supply the
water pump and fans for this
boiler.
 
2.      If you hope your Steam turbine need to be adjusted with “electric liguid ” technology .?  
3.      If you require us to supply the
 Pipes, valves, and other accessory .
 
4.      If you require us to supply the
coal delivery-feeding  system ?
 
5.      If you need us to supply the
electric control system. ?
 
6.      If you need some steam gas to be
   draw out in the system ,and use it
  to other place ( tasks ). ?