Power plant exact location:
(Province /city /town /district / street / )
|
Either in Toronto, Canada, or Kapuskasing, Canada. Dependingon regulations and approvals. 地点. | |
Power plant exact application :
( will be used for what purpose ? )
|
Generation for the national grid. 用于发电,并入当地电网. | |
You wish the Power level is : ( MW ) | 所需的功率: 10MW | |
Plant other condition :
|
1. Please give us the Plan arrangement drawing and photos. | |
2. The “fuels” : the plant will use coal /Oil / wood / or the above 2 together? |
Wood and coal together.
煤和木头混合用.
|
|
3. The detailed “water treatment” way ? 水处理的要求? | Not sure 不懂 | |
4. This plant “electricity “will be joint to the public national ( or local ) “electricity net ” or it will be running independently . |
National grid.
并入当地电网.
|
|
5. If you require us to design all Power plant for your side ?
( Including the Plant plan
arrangement design ? )
|
Yes .需要为我设计所有厂房和地基工程. | |
The “equipment ”
matching condition :
|
1. The boiler structure type : if
you like to use “Circle
Sulfuration-Bed” (CFB) type ?
If you should also supply the
water pump and fans for this
boiler.
|
Not sure.
锅炉参数:不懂.
|
2. If you hope your Steam turbine need to be adjusted with “electric liguid ” technology .? |
Don’t know.
电液调接:不懂.
|
|
3. If you require us to supply the
Pipes, valves, and other accessory .
|
Yes.是的,也要管路/阀门等所
有附件.
|
|
4. If you require us to supply the
coal delivery-feeding system ?
|
Yes.是的,要你们提供煤碳运送系统. | |
5. If you need us to supply the
electric control system. ?
|
Yes. 是的,要电子式电力调控
系统.
|
|
6. If you need some steam gas to be
draw out in the system ,and use it
to other place ( tasks ). ?
|